York University is experiencing a temporary disruption to its
facilities/service.
Facilities/Services have been disrupted at:
Location of Disruption:
Library Lane and The Roy McMurtry Green
Nature of Disruption:
Please be advised that due to necessary work related to geotechnical testing, a portion of the Roy McMurtry Green along Library Lane, Scholar Walk and Niagara Road may be temporarily restricted due to heavy vehicle maneuvering and drilling between 8am to 5pm, November 20 and 21, 2014.
The contractor performing the work will be available at all times to assist in directing pedestrians and vehicle traffic safely around test sites. When travelling throughout test areas, please watch for and obey all traffic signs and or traffic control personnel for your safety and convenience.
Occupants of adjacent buildings and pedestrians may experience some noise pollution due to intermittent drilling.
Your patience and cooperation is appreciated. For any questions or concerns regarding this initiative, please contact Stephen Wong, CSBO Construction Project Manager at swcwong@yorku.ca or (416) 937-3685.
Expected Duration of Disruption:
November 20 and 21, 2014 8:00 a.m. to 5:00 p.m.
Alternate Facilities/Services may be available at:
Alternative Location:
We apologize for any inconvenience this temporary disruption in
facilities/services may have caused.