Home


CSBO Notice
New Student Centre Construction / Library Lane Closure
(Saturday, November 5, 2016 between 8:00 am to 9:00 am)

 

As part of the Construction of the New Student Centre a Fire Hydrant pressure test is required this Saturday, November 5, 2016 at 8:00 am.   Access in both directions on Library Lane will be closed between Vari Hall and Central Square south entrance for 1 hour.

How will this impact the community?

Access along Library Lane will be impeded by a heavy flow of water coming from the north fire hydrant as indicated.

When travelling through the immediate construction area, watch for and adhere to all pedestrian signage, as well as traffic control personnel assigned to the site.
,If you have any questions or concerns regarding the project, please contact Stephen Wong, construction project manager, at 416-736-2100 ext. 44301 or swcwong@yorku.ca.

161102-transportation-bulletin-nov-2